Our Projects

  • 2251 SPEAKMAN DRIVE

    2251 Speakman Dr, Mississauga

    Read More
  • 2675 Steeles Ave. W

    Canada Cartage Warehouse – Orlando Corporation, Owners of the facility, commissioned Pollard to install a four-ply built-up membrane roofing system for their new warehouse facility in Brampton. This project was completed on time and on budget in the winter of 2014.

    Read More
  • 850 Military Trail

    Toronto Pan Am Centre (Markham Ontario) – Working with PCL Construction and the Toronto Pan Am Committee, Pollard designed and installed a two-ply built up membrane roofing system and a green roofing system for one of the main venues used during the Toronto Pan Am Games of 2015. This project was completed on time and within budget in March of 2014.

    Read More
  • NORTHUMBERLAND HILLS HOSPITAL

    1000 De Palma Drive, Cobourg Working with the Northumberland Health Care Corporation and general contractor Bondfield Construction, Pollard designed and installed a two-ply built-up membrane roofing system for the newly constructed community hospital. The project was completed during the winter of 2003.

    Read More
  • NIAGARA POLICE HEADQUARTERS

    Niagara Police Headquarters, Fort Erie

    Read More
  • CHURCHILL MEADOW NO. 4 JUNIOR PUBLIC SCHOOL

    3801 Thomas Street, Mississauga Subsequent to the St. Joan of Arc building commission, the Peel District School Board and general contractor Pre-Eng Contracting hired Pollard to design a roofing system for this sister building to the Catholic school.

    Read More
  • HOLLY COMMUNITY CENTRE

    171 Mapleton Avenue, Barrie The City of Barrie and general contractor Bondfield Construction chose Pollard for the installation of 100,000 square feet of two-ply built-up membrane roofing system for their new community centre. The project took just over one year to complete, during one of the most challenging winters on record.

    Read More
  • PINEWOOD TORONTO STUDIOS (FORMERLY FILMPORT STUDIOS)

    Don Roadway & Commissioners Street, Toronto Toronto Film Studios and general contractor Bird Construction Company commissioned Pollard for the new development of their high-profile film studios. Pollard installed a loose-laid ballasted EPDM system at the four block stages. The mega stage was a mechanically fastened insulation to concrete deck and adhering the TPO, the lower roof was a two-ply built-up membrane roofing system.

    Read More
  • ST. JOAN OF ARC CATHOLIC SECONDARY SCHOOL

    3801 Thomas Street, Mississauga The Dufferin Peel Catholic School Board and general contractor Aquicon Constructioncommissioned Pollard to design and install a two-ply and four ply, built-up roofing system for the brand new school building.

    Read More
  • PANATTONI DEVELOPMENTS

    Dixie and Eglington Centre, Mississauga Working with owner Panattoni Developments and general contractor Belrock Construction Ltd., Pollard installed a four-ply felt, asphalt and gravel roof system across three buildings under construction, covering more than 80,000 square feet.

    Read More